• 2 clay lamination dams (V ~ 600.000 mc)

• 6 Hydraulic items (a work of installation (floor space 33.00 * 50.00 m * 1.20 m), a work of interconnection, two works of restitution, one for the upper and one for the valley, an overflow spillway, 1 unloading)

• Installation of 4 sluices of the flat type for the gripping work (H = 7,5 m) moved by electric motors and non-salient lifting rods, contained inside the sluice gate itself

• Arrangement of the riverbed with support works of the water level and reinforcements and embankments

• Electrical systems that regulate and manage manufactured goods;

Remote control system and remote control able to detect the status of the controlled components, acquire the values ​​of the pressure flow measurement, etc., and receive and return the commands related to the operation of the motorized valves.

Customer: Veneto Region

Amount of the works: € 24.882.786,00

• 2 clay lamination dams (V ~ 600.000 mc)

• 6 Hydraulic items (a work of installation (floor space 33.00 * 50.00 m * 1.20 m), a work of interconnection, two works of restitution, one for the upper and one for the valley, an overflow spillway, 1 unloading)

• Installation of 4 sluices of the flat type for the gripping work (H = 7,5 m) moved by electric motors and non-salient lifting rods, contained inside the sluice gate itself

• Arrangement of the riverbed with support works of the water level and reinforcements and embankments

• Electrical systems that regulate and manage manufactured goods;

Remote control system and remote control able to detect the status of the controlled components, acquire the values ​​of the pressure flow measurement, etc., and receive and return the commands related to the operation of the motorized valves.

Customer: Veneto Region

Amount of the works: € 24.882.786,00